" These are projects other shops didn't want to tackle."
Kim Coomer-Vice President D & E Machine Co.
This is what Kim had to say when asked what exactly our case studies represented. D & E customers know that we can handle the more interesting and challenging projects.Most of these case studies were merely ideas without print's but, our team of skilled machinists brought them to life.
Scroll below to see what we can do at D & E Machine!
Welding
Fixture
- Customer: Robot Manufacturer
- What Does it do: Holds
clips for refrigerator door handle in place to be welded by a
robot.
- How is it used: Used in a production environment
in a robot welding cel.l
- Why was D & E picked
to make it: It was
an experimental fixture that needed to be engineered
and built
at the same time.
- How did D & E solve the
customer's problem: We
were able to supply a functional fixture that saved several thousand
dollars in up front engineering costs.
- What was special about it: It was a unique locating
device with special clamping that allowed
for multiple part loading
instead of one part loading.
- How long did it take D & E: 3-4 weeks
eliminating
the 6-8 week engineering time.
Carpet Stretcher/Clamps
- Customer: Local manufacturer of
auto interior carpet
- What does it do: Holds and stretches
sheets of un molded carpet and delivers it to the mold.
- How is it used: It's used in a
combination with carousel molding machines.
- Why was D & E picked
to make it: D & E
had
the expertise to redesign the existing clamps and also had
the experience from designing similar products.
- How did we solve the customer's problem:
D & E
was able to supply the frame and clamp system much faster and less
expensive than the Japanese manufacturer.
- What was special about it: This
item is unique
to their molding system.
Toilet Seat Cooling Tank
- Customer: Injection Molding Manufacturer
- What does it do: Holds injection molded parts
in fixed position to allow them to cool without warping or bending.
- How is it used:Parts were placed in cooling
fixture when removed from mold.
- Why was D & E picked
to make it: This
was a unique item that required creativity to come up with
a
design and fast delivery.
- How did we solve the customer's problem:
D & E
provided a simple, inexpensive cooling
tank and fixture.
- What was special about it: There has never
been
a requirement to cool a toilet seat. It was a high end, low
quantity item that required special attention.
- How long did it take us: 2 weeks
Lance Crane
- Description: Rebuild
- Customer: Fabricating Company
- What does it do: It transfers parts vertically.
- How is it used: It transfers pipe from ground
level to the third floor in an industrial steel environment.
- Why was D & E picked
to rebuild it: D & E
built
a new one prior, so we were familiar with the parts and
assembly.
- How did D & E solve
the customer's problem:
D & E
saved the customer 50 % by rebuilding
rather than making.
|
 |